Major Projects of Wai Tai Engineering (H.K.) Co., Limited
偉泰工程(香港)有限公司曾參與的大型工程項目
Latest on the top. 由新至舊排列
2024~now SD/2021/02 Boardwalk Underneath Island Eastern Corridor 東區走廊下之行人板道
Main Contractor : IEC Boardwalk JV
Trades: screeding, tiling
Main Contractor : IEC Boardwalk JV
Trades: screeding, tiling
2024~now HY/2019/13 Central Kowloon Route - Buildings, Electrical and Mechanical Works 中九龍幹線:大樓及機電工程
Main Contractor : Gammon Construction Limited
Trades: plastering, screeding, tiling
Main Contractor : Gammon Construction Limited
Trades: plastering, screeding, tiling
2023~2024 HK1003 Black Point Power Station Unit D2 龍鼓灘發電廠D2機組
Main Contractor : Gammon Engineering & Construction Company Limited
Trades: plastering, screeding, tiling
Main Contractor : Gammon Engineering & Construction Company Limited
Trades: plastering, screeding, tiling
2022~2023 HKAA3408 Hong Kong Airport Authority : Three Runway System Project - Three Runway Concourse and Apron Works 香港機場管理局:第三跑道客運廊及停機坪工程
Main Contractor : Beijing Urban Construction Group Company Limited – Chevalier Construction Company Limited Joint Venture
Trades: plastering, screeding, tiling
Main Contractor : Beijing Urban Construction Group Company Limited – Chevalier Construction Company Limited Joint Venture
Trades: plastering, screeding, tiling
2021~now HKAA3508 Hong Kong Airport Authority : Three Runway System Project - Terminal 2 Expansion Works 香港機場管理局:第三跑道二號客運大樓擴建工程
Main Contractor : Gammon Engineering & Construction Company Limited
Trades: screeding, tiling, stonework
Main Contractor : Gammon Engineering & Construction Company Limited
Trades: screeding, tiling, stonework
2021~2024 EP/SP/86/15 Organic Waste Treatment Facilities Phase 2 有機資源回收中心第二期
Main Contractor : Alchmex International Construction Limited
Trades: plastering, screeding, tiling, blockwork
Main Contractor : Alchmex International Construction Limited
Trades: plastering, screeding, tiling, blockwork
2021~2022 Tuen Mun Area 38 Permanent Aviation Fuel Facility : EAFS Operations Building Maintenance Works 屯門第38區永久航空燃油儲存庫:易高營運大樓維修工程
Client : ECO Aviation Fuel Services Limited
Trades: plastering, screeding, tiling, painting, waterproofing
Client : ECO Aviation Fuel Services Limited
Trades: plastering, screeding, tiling, painting, waterproofing
2021 STT 1554TW nevas smart car park at junction of Hoi Shing Road and Hoi Kok Street, Tsuen Wan (1st outdoor smart car park in HK) 荃灣海盛路與海角街交界處利華士智能停車場 (香港首個戶外智能停車場)
Client : Kin Wing Hong (International) Company Limited
Trades: concreting, metalwork, blockwork
Scope : concreting, installation of fire service access walkway & stair, installation of windshield panels, erection of fire service pump room
Client : Kin Wing Hong (International) Company Limited
Trades: concreting, metalwork, blockwork
Scope : concreting, installation of fire service access walkway & stair, installation of windshield panels, erection of fire service pump room
2019~2021 MTR SCL1128 Shatin to Central Link : South Ventilation Building to Admiralty Tunnels 港鐵沙田至中環綫:金鐘站鐵路隧道南面通風大樓
Main Contractor : Dragages-Bouygues Joint Venture
Trades: plastering, screeding, tiling
Main Contractor : Dragages-Bouygues Joint Venture
Trades: plastering, screeding, tiling
2019~2020 TMCLK C2 HY/2012/08 Tuen Mun – Chek Lap Kok Link : Northern Connection Sub-sea Tunnel Section 屯門至赤鱲角連接路:北面連接路海底隧道段
Main Contractor : Dragages-Bouygues Joint Venture
Trades: plastering, screeding, tiling
Main Contractor : Dragages-Bouygues Joint Venture
Trades: plastering, screeding, tiling
2018~2020 MTR SCL1124 Shatin to Central Link : Admiralty SCL Related Works 港鐵沙田至中環綫:金鐘站沙中綫相關工程
Main Contractor : Build King SCL1124 Joint Venture
Trade: metalwork
Main Contractor : Build King SCL1124 Joint Venture
Trade: metalwork
2018~2021 TMCLK C4 HY/2017/10 Tuen Mun – Chek Lap Kok Link : Northern Connection Tunnel Buildings, Electrical and Mechanical Works 屯門至赤鱲角連接路:北面連接路大樓
Main Contractor : Gammon Construction Limited
Trades: plastering, screeding, tiling, painting
Main Contractor : Gammon Construction Limited
Trades: plastering, screeding, tiling, painting
2017~2019 LTH CV/2012/08 Liantang / Heung Yuen Wai Boundary Control Point : Site Formation and Infrastructure Works - Contract 2 蓮塘/香園圍口岸:土地平整及基礎建設
Main Contractor : Dragages Hong Kong Limited
Trades: plastering, screeding, tiling, blockwork
Main Contractor : Dragages Hong Kong Limited
Trades: plastering, screeding, tiling, blockwork
2013~2018 Express Rail Link 810B : West Kowloon Terminus Station South 廣深港高速鐵路(香港段):西九龍總站南
Main Contractor : Laing O'Rourke - Hsin Chong - Paul Y. Joint Venture
Trades: blockwork, plastering, screeding, painting, tiling
Main Contractor : Laing O'Rourke - Hsin Chong - Paul Y. Joint Venture
Trades: blockwork, plastering, screeding, painting, tiling
2013~2015 TITKT SSW304 Design and Construction of Trade and Industry Tower in Kai Tak Development Area 啟德發展區工業貿易大樓
Main Contractor : Dragages Hong Kong Limited
Trades: blockwork, plastering, screeding, tiling
Main Contractor : Dragages Hong Kong Limited
Trades: blockwork, plastering, screeding, tiling
2013-2014 MTR WIL705 West Island Line : Kennedy Town Station and Overrun Tunnel 港鐵西港島綫:堅尼地城站
Main Contractor : Gammon Construction Limited
Trade : granite stonework
Main Contractor : Gammon Construction Limited
Trade : granite stonework
2011~2013 CTB Cruise Terminal Building and Ancillary Facilities For the Kai Tak Cruise Terminal Development 啟德郵輪碼頭大樓
Main Contractor : Dragages Hong Kong Limited
Trades: blockwork, plastering, screeding, painting, tiling
Main Contractor : Dragages Hong Kong Limited
Trades: blockwork, plastering, screeding, painting, tiling
2010~2012 CAD New Civil Aviation Department Headquarters on Airport Island 機場民航處新總部
Main Contractor : Dragages Hong Kong Limited
Trades: stonework and ABWF works
Main Contractor : Dragages Hong Kong Limited
Trades: stonework and ABWF works